
The buried foundation hole cleaning machine is a core supporting equipment for pile foundation and foundation burial construction, specially designed for optimizing the cleaning of bottom soil, sediment, and silt after hole formation.
Wide adaptability and strong compatibility with working conditions. This device can adapt to various complex geological environments such as loess, clay, sand and gravel layers, backfill soil layers, and silt layers. It supports cleaning operations for pile foundation holes, planting holes, and anchoring holes with diameters ranging from 300mm to 2000mm and depths ranging from 0 to 30 meters. It is also compatible with two construction modes: dry drilling and wet drilling with mud protection walls.
Efficient and energy-saving, significantly reducing costs and increasing efficiency. Equipped with an optimized hydraulic power system, the power output is stable and strong, the start-up is sensitive, and the operating energy consumption is low. The cleaning time for a single hole is reduced by more than 60% compared to traditional processes, without the need for a large amount of manual assistance. A single person can complete the entire cleaning process, greatly saving labor and construction costs. The equipment has a compact structure, easy disassembly and assembly, flexible movement, fast transition speed, no need for complex assembly and debugging, and can be quickly put into continuous construction in multiple batches, adapting to the needs of large-scale pile foundation engineering operations.
Address:Zhitian Economic Development Zone, Gongyi, Zhengzhou City, Henan Province
WhatsApp:+8615225155386
Wechat: 15225155386
E-mail:Jenny8802@163.com