
Fence piling drill is a special and efficient drilling equipment for garden fence, courtyard fence, farmland protection, and site fence infrastructure. It is mainly developed for the embedded drilling operation of fence piles, fence piles, fence posts. It can replace the old construction methods of traditional manual digging, hammering piling, and simple shovel digging. With many advantages such as portability and efficiency, wide geological adaptation, high drilling accuracy, simple operation, etc., it has become the preferred equipment for small and medium-sized infrastructure, garden and rural fence projects. It is highly adaptable to the procurement needs of various projects and individual construction procurement.
This equipment is equipped with a high-performance power system, which is divided into gasoline powered, electric, and hydraulic models. The power output is stable and strong, the start-up is fast, and the explosive power is sufficient. It solves the problems of traditional manual pile driving, which is laborious and slow in progress. The construction efficiency is improved by more than 90% compared to manual driving. The standard holes for conventional fence piles, with a diameter of 10-35cm and a depth of 0.5-2 meters, can be quickly formed in just a few seconds. The drilling is regular and the hole walls are tight and not loose, without the need for secondary hole repair, greatly reducing the construction period of the fence and suitable for large-scale drilling operations in batches. The core drill bit of the equipment is made of thickened high manganese steel material, which has been treated with special wear-resistant quenching technology. It has high hardness, strong toughness, wear resistance, and does not roll the blade. It can easily cope with various common construction geology such as soil, clay, sandstone soil, gravel ground, shallow hard soil, etc. The drilling process does not block the drill, does not deviate, and does not collapse, effectively ensuring the stability and firmness of the pre embedded fence pile.
Address:Zhitian Economic Development Zone, Gongyi, Zhengzhou City, Henan Province
WhatsApp:+8615225155386
Wechat: 15225155386
E-mail:Jenny8802@163.com