
No more strenuous manual digging for orchard tree planting, pole installation, and photovoltaic pile driving! This wheel-mounted gasoline spiral earth auger comes in two power versions: 2-stroke and 4-stroke. It works perfectly on flat farmland, mountainous areas and construction sites, easy for single-person operation, and has become a star machine for agriculture, forestry and construction projects.
Runs on mixed gasoline and two-stroke oil. Lightweight body with powerful instant torque, delivering fast drilling in hard soil, frozen ground and slightly stony soil. Easy to move short distances, ideal for sporadic small-hole jobs like orchard sapling planting and fence post holes.
Only pure gasoline is required. Features stable combustion, lower noise, less fuel consumption and mild vibration. It resists overheating during long-hour continuous work, with fewer breakdowns. Perfect for mass deep-hole tasks such as photovoltaic foundation piles, greenhouse support posts and road guardrail installation.
The machine is equipped with an integrated blue lifting frame and movable transport wheels. The drill rod is controlled by a hand crank chain lifting system, eliminating manual pressing. The spiral drill bit automatically lifts soil out of the hole. As shown in the picture, neatly shaped holes are formed, with excavated soil piled neatly beside the pit to save extra soil removal work. Drill bits from 3cm to 30cm in diameter are interchangeable, with a maximum drilling depth of 2 meters.
1.Push the machine to the working spot and step on the bottom support feet to secure the unit.
2.Refuel according to the model: mix gasoline with special oil for the 2-stroke version; fill pure gasoline for the 4-stroke unit.
3.Pull the recoil starter to ignite the engine, then slowly lower the drill rod via the hand crank.
4.The spiral bit rotates to dig automatically. Once the target depth is reached, crank the handle upward to lift the drill out for a one-step finished hole.
5.Roll the wheels to shift to the next drilling position without carrying the whole heavy machine.
✅ Agriculture & Orchard: Dig planting holes for fruit trees and sapling transplanting
✅ Power & Photovoltaic Industry: Drill pits for utility poles and photovoltaic support foundations
✅ Infrastructure & Fencing: Holes for greenhouse posts, guardrails and fence piles
✅ Landscaping: Pit digging for landscape tree transplantation
✅ Civil Engineering: Boreholes for small ground stakes and signpost installation
Built-in transport frame frees operators from holding heavy drills manually to prevent waist strain. Two power options match diverse working conditions. The spiral bit discharges soil smoothly, creating straight, collapse-resistant holes. Wheeled design enables flexible movement on rural dirt roads and construction sites. One auger replaces the digging work of 5 to 8 laborers, greatly cutting construction time and labor costs.
Address:Zhitian Economic Development Zone, Gongyi, Zhengzhou City, Henan Province
WhatsApp:+8615225155386
Wechat: 15225155386
E-mail:Jenny8802@163.com